Why do you inspect the first production sample before my order starts?
- Share
- Issue Time
- Jul 20,2024

Yes. YADA runs a First Article Inspection before every production job. The first piece is inspected and recorded, and full production only starts once it passes — so your order matches the approved specifications from unit one. Every new job starts with an FAI to verify setup and materials. Material or process changes trigger a re-check of the first article. Long run interruptions require a repeat FAI before resuming. Want the exact FAI checkpoints for your product? Confirm with our QC team.Key points
New orders
Changes
Interruptions